RERA Uttar Pradesh

  1. Salient features including access to the project, design for electric supply, street lighting, water supply arrangements. Site for disposal and treatment of storm and sullage water, public health services proposed.
  2. There will be clear discontinuance of the promoter’s business if promoter is failed to provide the property on the time and ready to move in possession should adhere to its definition of ready to move in.
  3. The promoter should agree and adhere to the given handover time of the project and he is liable to pay compensation if he fails to do so.
  4. Architecture and design standards, type of construction technology, earthquake resistance measures.
  5. In case of land and plotted development, the promoter has to disclose the area of the ploy being sold to the allottees including the ongoing and those who have not received. 
  6. The promoter shall disclose the size of the apartment thoroughly.
  7. Promoter has to register their projects if they are not done within the span of three months.
  8. Number, carpet area of apartments for sale in the project including the area of balcony and verandah, exclusive open terrace area with the apartments, type and area of plots for sale.
  9. Salient features including access to the project, design for electric supply, street lighting, water supply arrangements. Site for disposal and treatment of storm and sullage water, public health services proposed.
  10. Gantt charts including the plan of development works, stage wise time and schedule of completion of project. Provision of basic amenities like water, sanitation and electricity etc.
  11. The promoter should agree and adhere to the given handover time of the project and he is liable to pay compensation if he fails to do so.
  12. Architecture and design standards, type of construction technology, earthquake resistance measures.
  13. Contact address, contact numbers and Email-ids of the promoter and other officials handling the project.
  14. RERA can discontinue the promoter’s business if promoter is failing to provide property on time and not adhering the definition of ready to move in possession.
  15. Details of the location with latitude and longitude of the starting and end points of the project.
  16. Name and addresses of the registered agents.
  17. A promoter has to upload status of construction of each building with photographs and status of construction of each floor with photographs.
  18. Permission from water and sewage department.